Caterpillar
Cummins
Generac
Kohler
ISO 9001
EGSA Member
24/7 DISPATCH: 1-800-GENSET-1

Every kW Rated.  Every Unit Tested.  Every Delivery Guaranteed.

4 hrs
Max dispatch guarantee
98.4%
On-time delivery rate
2,400+
Emergency deployments completed
47
States covered
< 0.1%
Field failure rate
12
Regional depots

Three Guarantees. Zero Exceptions.

We don't hedge with “best efforts.” These are contractual commitments backed by service credits — in writing, every time.

Guarantee #1

Guaranteed 4-Hour Emergency Dispatch

From your call to engine-running on site — or we credit your first rental day.

  • Dedicated dispatch team staffed 24 / 7 / 365
  • Pre-staged units at 12 regional distribution points
  • GPS-tracked transport — live ETA on your phone
  • Backup unit reserved at nearest depot for every active deployment
4 hrs
Max dispatch time
98.4%
On-time delivery rate
47 states
Coverage area
// Guarantee #1 of 3
Guarantee #2

Guaranteed Load-Bank Tested Before Shipment

Every unit runs at 100% rated load for 4 hours before leaving the warehouse.

  • Computerized load-bank test report shipped with every unit
  • Coolant, oil, and fuel systems verified at operating temperature
  • Transfer switch function tested under simulated utility outage
  • ATS compatibility verified against your facility specs before dispatch
100%
Load-bank tested
4-hr
Full-load run test
< 0.1%
Field failure rate
// Guarantee #2 of 3
Guarantee #3

Guaranteed Fuel-Ready and Commissioned On Site

Our technician stays until the transfer switch closes and your load is confirmed stable.

  • Full fuel load (12–24 hr runtime) included in base rental
  • Licensed electrician completes all connection and commissioning work
  • Load acceptance test performed before technician departs
  • Extended on-site standby packages available for critical facilities
100%
Fuel-ready on arrival
On-site
Commissioning included
72-hr
Technician standby option
// Guarantee #3 of 3

Guaranteed Load-Bank Tested
Before Shipment

Every unit below carries a 4-hour load-bank test certificate. Click any row to expand full spec sheet and PDF download.

Custom Load Calculation
Standard30–60 kW
Premium100–200 kW
Critical350–500+ kW
Click row to expand full specs
ModelkW RatingFuelRuntimeNoiseTierDay RateStatus
GP-30D
Cummins
30 kWDiesel24 hrs @ full load68 dB(A) @ 7mStandard$180–$240/day
Ready
GP-60D
Generac
60 kWDiesel20 hrs @ full load71 dB(A) @ 7mStandard$310–$390/day
Ready
GP-100D
Caterpillar
100 kWDiesel18 hrs @ full load74 dB(A) @ 7mPremium$490–$620/day
Ready
GP-200D
Kohler
200 kWDiesel16 hrs @ full load76 dB(A) @ 7mPremium$820–$1,050/day
Ready
GP-350D
Caterpillar
350 kWDiesel14 hrs @ full load78 dB(A) @ 7mCritical$1,400–$1,750/day
Ready
GP-500D
Cummins
500 kWDiesel12 hrs @ full load80 dB(A) @ 7mCritical$2,100–$2,600/day
Ready
GP-100NG
Generac
100 kWNatural GasContinuous (pipeline)72 dB(A) @ 7mPremium$460–$580/day
Call

* Rates exclude fuel surcharge, delivery beyond 150 mi, and extended-standby technician packages.

** Paralleling configurations available for loads exceeding 500 kW — call dispatch.

You've reviewed 3+ generator tiers
Custom Calc

Guaranteed Fuel-Ready and
Commissioned On Site

Industry-specific deployment protocols, compliance documentation, and on-site commissioning — every sector, every time.

Hospital corridor with bright overhead lighting and medical equipment
Healthcare

Keep Life-Support Online

OR suites, ICUs, and pharmacy refrigeration cannot tolerate a 30-second gap. Our critical-tier units include N+1 redundancy packages and NFPA 110 compliance documentation.

< 10 sec
Transfer time
NFPA 110
Compliant
Data center server racks with blue lighting in rows
Data Center

Zero-Downtime SLA Support

Tier II–IV facilities need paralleling capability and SCADA integration. Our 350–500 kW units ship with dual ATS and remote monitoring endpoints.

N+1
Redundancy
SCADA
Ready
Construction site with heavy machinery and workers in safety vests at dusk
Construction

500 kW on a Muddy Site by Thursday

Rough-terrain delivery, temporary power panels, and weekly fuel service. We've set up power for projects from 5-story pours to highway bridge closures.

Rough
Terrain delivery
Weekly
Fuel service
Outdoor event stage with colorful stage lighting and crowd at night
Events

Silent Power, Visible Results

Outdoor concerts, broadcast trucks, and temporary command centers. Noise-attenuated enclosures, clean power conditioning, and same-day setup crews.

68 dB
Noise floor
Clean
Power output

From Grid Failure
to Running Generators

Three steps. Four-hour guarantee. No exceptions. Here's exactly what happens from the moment your power fails to the moment your load is stable.

01
Emergency Call Received

You Call. We Answer. In Under 90 Seconds.

A live dispatch engineer — not a call center — picks up 24/7/365. They qualify your load requirement, confirm your site address, and generate a dispatch order in real time while you're still on the phone. Average time from call to dispatch confirmation: 4 minutes.

  • Live engineer, not a bot
  • Load qualification on first call
  • Dispatch order issued in < 4 min
  • Confirmation SMS + email immediately
02
Unit Selected & Staged

Nearest Tested Unit Assigned From Regional Depot

Our dispatch system identifies the closest available unit matching your kW requirement, fuel type, and ATS compatibility. The test certificate is pulled, fuel level confirmed at 100%, and the transport crew is activated — all within 20 minutes of your call.

  • 12 regional depot network
  • Load-bank cert pulled automatically
  • Fuel confirmed at 100% before departure
  • GPS tracker activated on transport
03
On-Site Delivery & Commissioning

Technician Stays Until Your Load Is Stable

Our licensed electrician completes all connection work, performs a load acceptance test, and doesn't leave until the transfer switch has closed and your critical loads are confirmed running. You receive a commissioning report on-site.

  • Licensed electrician on every deployment
  • Full load acceptance test performed
  • Transfer switch closure confirmed
  • Commissioning report provided on-site

Get a Custom
Load Calculation

Already know your load profile? Our engineers will review your requirements and return a formal power recommendation within 2 business hours — including unit spec, ATS selection, and fuel consumption estimate.

Formal power recommendation document
Load calculation worksheet (Excel)
ATS selection guidance for your switchgear
Fuel consumption & runtime estimate
Follow-up call with a licensed engineer

Response Time

2 business hours

From form submission to engineer response

Load Qualification Form

Takes 3 minutes. Engineer responds in 2 hours.

Response within 2 business hours · No obligation